Monday, December 14, 2009

Inch by Inch

The bathroom remodel is moving along nicely. Today, I pulled the border off the walls, took the mirror down, removed the towel racks, removed the crown molding, and cleaned the walls preparing them for paint. Here you can see where some of the thigns were, most notably the toilet. Here you can see were the mirror and light fixture were.
Here, you can see were the crown molding, light fixture, and mirror were.
Right above the shower, you can see were the shower curtian rod was, among other things in the picture.
I did get the first phase of spackling done as well as tape around the trim work. Hopefully, I can do the second round of spackle tomorrow and maybe even sling some primer on the wall. I do hope so.
In other news, I did not move as fast as I wanted to on the project due to the Kaylee being sick. We thought she may have had an allergic reaction to the flue shot (not H1 N1) she got last week, but the doctor thinks it may be a virus combined with an allergic reaction. She should be better in a couple of days.
-J

No comments: